US Bridges

Yolande Dr. over Coulee

Good

Lafayette Parish, Louisiana · 0.03 MI NE of Rena DR · Structure no. 032830114920311

Built
1965
60 years old
Condition
Good
inspected January 2024
Type
Slab
Concrete
Length
38 ft
2 main spans
Daily traffic
550
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Yolande Dr. over Coulee is a concrete slab carrying Yolande Dr. over Coulee in Lafayette Parish, Louisiana. It was built in 1965, so it is 60 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, projected to reach 605 by 2040. The structure is 38 ft (11.6 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesYolande Dr.
CrossesCoulee
Location0.03 MI NE of Rena DR
RouteCounty Highway 0
Coordinates30.19077, -92.05254
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.9 US tons
Inventory rating21.4 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span19 ft (5.8 m)
Deck width38 ft (11.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2020)
Projected traffic605 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Yolande Dr. over Coulee built?

It was built in 1965, making it 60 years old in 2025.

What condition is Yolande Dr. over Coulee in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Yolande Dr. over Coulee carry?

About 550 vehicles per day (2020 count).

How long is Yolande Dr. over Coulee?

The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 38 ft wide.

Who owns Yolande Dr. over Coulee?

It is owned by the City or Municipal Highway Agency.