US Bridges

Lithcombe RD over Coulee Manuel

PoorPosted for load

Evangeline Parish, Louisiana · 1.0 MI S of US 167 · Structure no. 032030400921571

Built
2001
24 years old
Condition
Poor
inspected April 2024
Type
Culvert
Steel
Length
33 ft
3 main spans
Daily traffic
80
2021 count
Owner
County
County Highway Agency

About this bridge

Lithcombe RD over Coulee Manuel is a steel culvert carrying Lithcombe RD over Coulee Manuel in Evangeline Parish, Louisiana. It was built in 2001, so it is 24 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 80 vehicles a day, projected to reach 88 by 2041. The structure is 33 ft (10.1 m) long and 41 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesLithcombe RD
CrossesCoulee Manuel
Location1.0 MI S of US 167
RouteCounty Highway 0
Coordinates30.66907, -92.2621
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating66 US tons
Inventory rating50.7 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans3
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span11 ft (3.4 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2021)
Projected traffic88 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lithcombe RD over Coulee Manuel built?

It was built in 2001, making it 24 years old in 2025.

What condition is Lithcombe RD over Coulee Manuel in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.

How much traffic does Lithcombe RD over Coulee Manuel carry?

About 80 vehicles per day (2021 count).

How long is Lithcombe RD over Coulee Manuel?

The structure is 33 ft (10.1 m) long with a longest span of 11 ft (3.4 m) and a deck 41 ft wide.

Who owns Lithcombe RD over Coulee Manuel?

It is owned by the County Highway Agency.