US Bridges

Central Throughway over Illinois Central Rr.

Good

East Baton Rouge Parish, Louisiana · 0.7 Mi. N. of US190 · Structure no. 611700000610331

Built
2011
14 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,467 ft
19 main spans
Daily traffic
10,400
2019 count
Owner
County
County Highway Agency

About this bridge

Central Throughway over Illinois Central Rr. is a prestressed concrete stringer/multi-beam or girder carrying Central Throughway over Illinois Central Rr. in East Baton Rouge Parish, Louisiana. It was built in 2011, so it is 14 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,400 vehicles a day, roughly 10% of them trucks, projected to reach 11,440 by 2039. The structure is 1,467 ft (447.1 m) long and 85 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCentral Throughway
CrossesIllinois Central Rr.
Location0.7 Mi. N. of US190
RouteCounty Highway 0
Coordinates30.475, -91.01246
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating39.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans19
Design loadHS 20
Structure length1,467 ft (447.1 m)
Longest span110 ft (33.5 m)
Deck width85 ft (25.9 m)
Roadway width82 ft (25 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,400 (2019)
Projected traffic11,440 by 2039
Trucks10%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Central Throughway over Illinois Central Rr. built?

It was built in 2011, making it 14 years old in 2025.

What condition is Central Throughway over Illinois Central Rr. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Central Throughway over Illinois Central Rr. carry?

About 10,400 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is Central Throughway over Illinois Central Rr.?

The structure is 1,467 ft (447.1 m) long with a longest span of 110 ft (33.5 m) and a deck 85 ft wide.

Who owns Central Throughway over Illinois Central Rr.?

It is owned by the County Highway Agency.