US Bridges

Pecue Lane over I-10

Good

East Baton Rouge Parish, Louisiana · 1.0 MI SW of US 61 · Structure no. 611700000610012

Built
2021
4 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
214 ft
2 main spans
Daily traffic
41,300
2019 count
Owner
State
State Highway Agency

About this bridge

Pecue Lane over I-10 is a concrete stringer/multi-beam or girder carrying Pecue Lane over I-10 in East Baton Rouge Parish, Louisiana. It was built in 2021, so it is 4 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 41,300 vehicles a day, roughly 5% of them trucks, projected to reach 45,430 by 2039. The structure is 214 ft (65.2 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPecue Lane
CrossesI-10
Location1.0 MI SW of US 61
RouteCounty Highway 0
Coordinates30.36702, -91.04681
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating49.6 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadGreater than HL 93
Structure length214 ft (65.2 m)
Longest span110 ft (33.5 m)
Deck width63 ft (19.3 m)
Roadway width61 ft (18.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41,300 (2019)
Projected traffic45,430 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pecue Lane over I-10 built?

It was built in 2021, making it 4 years old in 2025.

What condition is Pecue Lane over I-10 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Pecue Lane over I-10 carry?

About 41,300 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Pecue Lane over I-10?

The structure is 214 ft (65.2 m) long with a longest span of 110 ft (33.5 m) and a deck 63 ft wide.

Who owns Pecue Lane over I-10?

It is owned by the State Highway Agency.