US Bridges

Contraband Parkway over Drain

Good

Calcasieu Parish, Louisiana · 0.1 MI E of Lauberge Blvd · Structure no. 071000000071026

Built
2017
8 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
1,809
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Contraband Parkway over Drain is a concrete culvert carrying Contraband Parkway over Drain in Calcasieu Parish, Louisiana. It was built in 2017, so it is 8 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,809 vehicles a day, roughly 2% of them trucks, projected to reach 1,989 by 2043. The structure is 25 ft (7.6 m) long and 117 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesContraband Parkway
CrossesDrain
Location0.1 MI E of Lauberge Blvd
RouteCity Street 0
Coordinates30.20276, -93.24824
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating44 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length25 ft (7.6 m)
Longest span12 ft (3.7 m)
Deck width117 ft (35.7 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,809 (2023)
Projected traffic1,989 by 2043
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Contraband Parkway over Drain built?

It was built in 2017, making it 8 years old in 2025.

What condition is Contraband Parkway over Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Contraband Parkway over Drain carry?

About 1,809 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is Contraband Parkway over Drain?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.7 m) and a deck 117 ft wide.

Who owns Contraband Parkway over Drain?

It is owned by the City or Municipal Highway Agency.