US Bridges

Clyde Fant Parkway over Clyde Fant Pkwy Ramps

Good

Caddo Parish, Louisiana · 0.4 Mi. S of Jack Wells B · Structure no. 040932316934516

Built
1998
27 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
300 ft
4 main spans
Daily traffic
11,190
1990 count
Owner
City
City or Municipal Highway Agency

About this bridge

Clyde Fant Parkway over Clyde Fant Pkwy Ramps is a prestressed concrete stringer/multi-beam or girder carrying Clyde Fant Parkway over Clyde Fant Pkwy Ramps in Caddo Parish, Louisiana. It was built in 1998, so it is 27 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,190 vehicles a day, projected to reach 12,309 by 2010. The structure is 300 ft (91.4 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesClyde Fant Parkway
CrossesClyde Fant Pkwy Ramps
Location0.4 Mi. S of Jack Wells B
RouteCity Street 0
Coordinates32.52635, -93.75197
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating56.4 US tons
Inventory rating29.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length300 ft (91.4 m)
Longest span75 ft (22.9 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,190 (1990)
Projected traffic12,309 by 2010
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Clyde Fant Parkway over Clyde Fant Pkwy Ramps built?

It was built in 1998, making it 27 years old in 2025.

What condition is Clyde Fant Parkway over Clyde Fant Pkwy Ramps in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Clyde Fant Parkway over Clyde Fant Pkwy Ramps carry?

About 11,190 vehicles per day (1990 count).

How long is Clyde Fant Parkway over Clyde Fant Pkwy Ramps?

The structure is 300 ft (91.4 m) long with a longest span of 75 ft (22.9 m) and a deck 43 ft wide.

Who owns Clyde Fant Parkway over Clyde Fant Pkwy Ramps?

It is owned by the City or Municipal Highway Agency.