US Bridges

Ockley Drive over Ockley Ditch

Good

Caddo Parish, Louisiana · 0.2 MI East of Line Ave. · Structure no. 040932281934461

Built
2000
25 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
60 ft
1 main span
Daily traffic
1,600
1979 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ockley Drive over Ockley Ditch is a concrete continuous box beam or girders - multiple carrying Ockley Drive over Ockley Ditch in Caddo Parish, Louisiana. It was built in 2000, so it is 25 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,600 vehicles a day, projected to reach 1,760 by 1999. The structure is 60 ft (18.3 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOckley Drive
CrossesOckley Ditch
Location0.2 MI East of Line Ave.
RouteCity Street 0
Coordinates32.469, -93.74377
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width48 ft (14.7 m)
Roadway width32 ft (9.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,600 (1979)
Projected traffic1,760 by 1999
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ockley Drive over Ockley Ditch built?

It was built in 2000, making it 25 years old in 2025.

What condition is Ockley Drive over Ockley Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Ockley Drive over Ockley Ditch carry?

About 1,600 vehicles per day (1979 count).

How long is Ockley Drive over Ockley Ditch?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 48 ft wide.

Who owns Ockley Drive over Ockley Ditch?

It is owned by the City or Municipal Highway Agency.