Good

Caddo Parish, Louisiana · 1.0 MI SW of LA 1 · Structure no. 040932210933911

Built
1997
28 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
150
2019 count
Owner
County
County Highway Agency

About this bridge

Robson RD over Chico Bayou Relief is a prestressed concrete stringer/multi-beam or girder carrying Robson RD over Chico Bayou Relief in Caddo Parish, Louisiana. It was built in 1997, so it is 28 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, projected to reach 165 by 2039. The structure is 150 ft (45.7 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRobson RD
CrossesChico Bayou Relief
Location1.0 MI SW of LA 1
RouteCounty Highway 0
Coordinates32.35093, -93.65221
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.8 US tons
Inventory rating27.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span50 ft (15.2 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2019)
Projected traffic165 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Robson RD over Chico Bayou Relief built?

It was built in 1997, making it 28 years old in 2025.

What condition is Robson RD over Chico Bayou Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Robson RD over Chico Bayou Relief carry?

About 150 vehicles per day (2019 count).

How long is Robson RD over Chico Bayou Relief?

The structure is 150 ft (45.7 m) long with a longest span of 50 ft (15.2 m) and a deck 31 ft wide.

Who owns Robson RD over Chico Bayou Relief?

It is owned by the County Highway Agency.