US Bridges

LA 1 over Caddo Lake

Good

Caddo Parish, Louisiana · 12.28 · Structure no. 040900000040909

Built
2024
1 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
2,050 ft
22 main spans
Daily traffic
4,850
2021 count
Owner
State
State Highway Agency

About this bridge

LA 1 over Caddo Lake is a concrete stringer/multi-beam or girder carrying LA 1 over Caddo Lake in Caddo Parish, Louisiana. It was built in 2024, so it is 1 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,850 vehicles a day, roughly 12% of them trucks, projected to reach 5,335 by 2041. The structure is 2,050 ft (624.8 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLA 1
CrossesCaddo Lake
Location12.28
RouteState Highway 1
Coordinates32.70146, -93.94506
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating57.1 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans22
Design loadGreater than HL 93
Structure length2,050 ft (624.8 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,850 (2021)
Projected traffic5,335 by 2041
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was LA 1 over Caddo Lake built?

It was built in 2024, making it 1 years old in 2025.

What condition is LA 1 over Caddo Lake in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does LA 1 over Caddo Lake carry?

About 4,850 vehicles per day (2021 count), of which roughly 12% are trucks.

How long is LA 1 over Caddo Lake?

The structure is 2,050 ft (624.8 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns LA 1 over Caddo Lake?

It is owned by the State Highway Agency.