US Bridges

I-75 Northbound over Pokeberry Road

Fair

Scott County, Kentucky · 2.3 MI N. of Ky 32 · Structure no. 105B00145R

Built
2007
18 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
170 ft
3 main spans
Daily traffic
22,442
2023 count
Owner
State
State Highway Agency

About this bridge

I-75 Northbound over Pokeberry Road is a prestressed concrete continuous stringer/multi-beam or girder carrying I-75 Northbound over Pokeberry Road in Scott County, Kentucky. It was built in 2007, so it is 18 years old, younger than the Kentucky average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 22,442 vehicles a day, roughly 25% of them trucks, projected to reach 27,827 by 2043. The structure is 170 ft (51.9 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-75 Northbound
CrossesPokeberry Road
Location2.3 MI N. of Ky 32
RouteInterstate 75
Coordinates38.41167, -84.58
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating52.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length170 ft (51.9 m)
Longest span64 ft (19.4 m)
Deck width62 ft (19 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,442 (2023)
Projected traffic27,827 by 2043
Trucks25%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 Northbound over Pokeberry Road built?

It was built in 2007, making it 18 years old in 2025.

What condition is I-75 Northbound over Pokeberry Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does I-75 Northbound over Pokeberry Road carry?

About 22,442 vehicles per day (2023 count), of which roughly 25% are trucks.

How long is I-75 Northbound over Pokeberry Road?

The structure is 170 ft (51.9 m) long with a longest span of 64 ft (19.4 m) and a deck 62 ft wide.

Who owns I-75 Northbound over Pokeberry Road?

It is owned by the State Highway Agency.