US Bridges

South River RD Con over Levisa Fork

Good

Pike County, Kentucky · Over Levisa Fork · Structure no. 098C00198N

Built
2020
5 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
180 ft
2 main spans
Daily traffic
500
2020 count
Owner
County
County Highway Agency

About this bridge

South River RD Con over Levisa Fork is a prestressed concrete continuous stringer/multi-beam or girder carrying South River RD Con over Levisa Fork in Pike County, Kentucky. It was built in 2020, so it is 5 years old, younger than the Kentucky average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, projected to reach 500 by 2040. The structure is 180 ft (54.9 m) long and 18 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSouth River RD Con
CrossesLevisa Fork
LocationOver Levisa Fork
RouteCounty Highway 1181
Coordinates37.36583, -82.225
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadGreater than HL 93
Structure length180 ft (54.9 m)
Longest span117 ft (35.7 m)
Deck width18 ft (5.5 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2020)
Projected traffic500 by 2040
Trucks—
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was South River RD Con over Levisa Fork built?

It was built in 2020, making it 5 years old in 2025.

What condition is South River RD Con over Levisa Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does South River RD Con over Levisa Fork carry?

About 500 vehicles per day (2020 count).

How long is South River RD Con over Levisa Fork?

The structure is 180 ft (54.9 m) long with a longest span of 117 ft (35.7 m) and a deck 18 ft wide.

Who owns South River RD Con over Levisa Fork?

It is owned by the County Highway Agency.