US Bridges

West Brown Road over Right Fork Blaine Creek

Fair

Lawrence County, Kentucky · 0.04 MI S of JCT Ky 32 · Structure no. 064C00093N

Built
2018
7 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
30 ft
1 main span
Daily traffic
20
2009 count
Owner
County
County Highway Agency

About this bridge

West Brown Road over Right Fork Blaine Creek is a steel stringer/multi-beam or girder carrying West Brown Road over Right Fork Blaine Creek in Lawrence County, Kentucky. It was built in 2018, so it is 7 years old, younger than the Kentucky average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, projected to reach 20 by 2029. The structure is 30 ft (9.1 m) long and 16 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesWest Brown Road
CrossesRight Fork Blaine Creek
Location0.04 MI S of JCT Ky 32
RouteCounty Highway 1234
Coordinates38.01917, -82.92306
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110 US tons
Inventory rating72.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span29 ft (8.7 m)
Deck width16 ft (4.9 m)
Roadway width15 ft (4.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2009)
Projected traffic20 by 2029
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was West Brown Road over Right Fork Blaine Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is West Brown Road over Right Fork Blaine Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does West Brown Road over Right Fork Blaine Creek carry?

About 20 vehicles per day (2009 count).

How long is West Brown Road over Right Fork Blaine Creek?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.7 m) and a deck 16 ft wide.

Who owns West Brown Road over Right Fork Blaine Creek?

It is owned by the County Highway Agency.