I-65 SB Off Ramp over S Floyd ST
PoorPosted for loadJefferson County, Kentucky · 0.1 MI N of E Jefferson · Structure no. 056B00196N
- Built
- 1963
- 62 years old, rebuilt 1980
- Condition
- Poor
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 128 ft
- 1 main span
- Daily traffic
- 84,001
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
I-65 SB Off Ramp over S Floyd ST is a steel stringer/multi-beam or girder carrying I-65 SB Off Ramp over S Floyd ST in Jefferson County, Kentucky. It was built in 1963 and reconstructed in 1980, so it is 62 years old, older than the Kentucky average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 84,001 vehicles a day, roughly 16% of them trucks, projected to reach 92,401 by 2032. The structure is 128 ft (39 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-65 SB Off Ramp over S Floyd ST built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1980.
What condition is I-65 SB Off Ramp over S Floyd ST in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does I-65 SB Off Ramp over S Floyd ST carry?
About 84,001 vehicles per day (2012 count), of which roughly 16% are trucks.
How long is I-65 SB Off Ramp over S Floyd ST?
The structure is 128 ft (39 m) long with a longest span of 60 ft (18.2 m) and a deck 37 ft wide.
Who owns I-65 SB Off Ramp over S Floyd ST?
It is owned by the State Highway Agency.