US Bridges

CS3054 over Looney Creek

Good

Harlan County, Kentucky · 200 Ft North of KY160 · Structure no. 048C00210N

Built
2020
5 years old
Condition
Good
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
76 ft
1 main span
Daily traffic
200
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

CS3054 over Looney Creek is a prestressed concrete box beam or girders - multiple carrying CS3054 over Looney Creek in Harlan County, Kentucky. It was built in 2020, so it is 5 years old, younger than the Kentucky average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, projected to reach 200 by 2041. The structure is 76 ft (23.2 m) long and 30 ft wide.

CarriesCS3054
CrossesLooney Creek
Location200 Ft North of KY160
RouteCity Street 3054
Coordinates36.97694, -82.985
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating75.7 US tons
Inventory rating58.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length76 ft (23.2 m)
Longest span70 ft (21.3 m)
Deck width30 ft (9.2 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2021)
Projected traffic200 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CS3054 over Looney Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is CS3054 over Looney Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does CS3054 over Looney Creek carry?

About 200 vehicles per day (2021 count).

How long is CS3054 over Looney Creek?

The structure is 76 ft (23.2 m) long with a longest span of 70 ft (21.3 m) and a deck 30 ft wide.

Who owns CS3054 over Looney Creek?

It is owned by the City or Municipal Highway Agency.