Ky 3005 over Gaither Station/Csx RR
GoodHardin County, Kentucky · 0.5 MI S of Ky 1904 · Structure no. 047B00169R
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected November 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 237 ft
- 3 main spans
- Daily traffic
- 3,436
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Ky 3005 over Gaither Station/Csx RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Ky 3005 over Gaither Station/Csx RR in Hardin County, Kentucky. It was built in 2013, so it is 12 years old, younger than the Kentucky average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,436 vehicles a day, roughly 18% of them trucks, projected to reach 3,436 by 2040. The structure is 237 ft (72.2 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ky 3005 over Gaither Station/Csx RR built?
It was built in 2013, making it 12 years old in 2025.
What condition is Ky 3005 over Gaither Station/Csx RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.
How much traffic does Ky 3005 over Gaither Station/Csx RR carry?
About 3,436 vehicles per day (2020 count), of which roughly 18% are trucks.
How long is Ky 3005 over Gaither Station/Csx RR?
The structure is 237 ft (72.2 m) long with a longest span of 114 ft (34.7 m) and a deck 43 ft wide.
Who owns Ky 3005 over Gaither Station/Csx RR?
It is owned by the State Highway Agency.