US Bridges

Industrial Parkway over Pleasant Valley Road

Good

Greenup County, Kentucky · 5.31 MI S of JCT US23 · Structure no. 045B00081N

Built
2003
22 years old
Condition
Good
inspected August 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
272 ft
3 main spans
Daily traffic
5,110
2021 count
Owner
State
State Highway Agency

About this bridge

Industrial Parkway over Pleasant Valley Road is a prestressed concrete continuous stringer/multi-beam or girder carrying Industrial Parkway over Pleasant Valley Road in Greenup County, Kentucky. It was built in 2003, so it is 22 years old, younger than the Kentucky average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,110 vehicles a day, roughly 24% of them trucks, projected to reach 5,110 by 2041. The structure is 272 ft (82.9 m) long and 58 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesIndustrial Parkway
CrossesPleasant Valley Road
Location5.31 MI S of JCT US23
RouteState Highway 67
Coordinates38.48222, -82.79611
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.8 US tons
Inventory rating37.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length272 ft (82.9 m)
Longest span92 ft (28 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,110 (2021)
Projected traffic5,110 by 2041
Trucks24%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Industrial Parkway over Pleasant Valley Road built?

It was built in 2003, making it 22 years old in 2025.

What condition is Industrial Parkway over Pleasant Valley Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2021.

How much traffic does Industrial Parkway over Pleasant Valley Road carry?

About 5,110 vehicles per day (2021 count), of which roughly 24% are trucks.

How long is Industrial Parkway over Pleasant Valley Road?

The structure is 272 ft (82.9 m) long with a longest span of 92 ft (28 m) and a deck 58 ft wide.

Who owns Industrial Parkway over Pleasant Valley Road?

It is owned by the State Highway Agency.