Man Owar Boulevar over NS (cno&tp) System
FairFayette County, Kentucky · .3 MI W of US 27 · Structure no. 034C00042N
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected April 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 213 ft
- 3 main spans
- Daily traffic
- 22,594
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Man Owar Boulevar over NS (cno&tp) System is a prestressed concrete continuous stringer/multi-beam or girder carrying Man Owar Boulevar over NS (cno&tp) System in Fayette County, Kentucky. It was built in 1985, so it is 40 years old, younger than the Kentucky average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,594 vehicles a day, roughly 6% of them trucks, projected to reach 22,594 by 2041. The structure is 213 ft (64.9 m) long and 89 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Man Owar Boulevar over NS (cno&tp) System built?
It was built in 1985, making it 40 years old in 2025.
What condition is Man Owar Boulevar over NS (cno&tp) System in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2021.
How much traffic does Man Owar Boulevar over NS (cno&tp) System carry?
About 22,594 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is Man Owar Boulevar over NS (cno&tp) System?
The structure is 213 ft (64.9 m) long with a longest span of 78 ft (23.8 m) and a deck 89 ft wide.
Who owns Man Owar Boulevar over NS (cno&tp) System?
It is owned by the County Highway Agency.