US Bridges

Ramp G New Circle over US 60 (versailles Rd)

Good

Fayette County, Kentucky · US 60 / New Circle RD · Structure no. 034B00168N

Built
2016
9 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
307 ft
4 main spans
Daily traffic
10,480
2022 count
Owner
State
State Highway Agency

About this bridge

Ramp G New Circle over US 60 (versailles Rd) is a steel continuous stringer/multi-beam or girder carrying Ramp G New Circle over US 60 (versailles Rd) in Fayette County, Kentucky. It was built in 2016, so it is 9 years old, younger than the Kentucky average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,480 vehicles a day, projected to reach 11,737 by 2042. The structure is 307 ft (93.6 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRamp G New Circle
CrossesUS 60 (versailles Rd)
LocationUS 60 / New Circle RD
RouteState Highway 4
Coordinates38.04583, -84.56333
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating93.6 US tons
Inventory rating72.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadGreater than HL 93
Structure length307 ft (93.6 m)
Longest span85 ft (25.9 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,480 (2022)
Projected traffic11,737 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp G New Circle over US 60 (versailles Rd) built?

It was built in 2016, making it 9 years old in 2025.

What condition is Ramp G New Circle over US 60 (versailles Rd) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Ramp G New Circle over US 60 (versailles Rd) carry?

About 10,480 vehicles per day (2022 count).

How long is Ramp G New Circle over US 60 (versailles Rd)?

The structure is 307 ft (93.6 m) long with a longest span of 85 ft (25.9 m) and a deck 28 ft wide.

Who owns Ramp G New Circle over US 60 (versailles Rd)?

It is owned by the State Highway Agency.