Grant RD over Branch-E.Fk.Rockhouse CR
FairPosted for loadCalloway County, Kentucky · .3 MI E of JCT CR 5360 · Structure no. 018C00100N
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 32
- 2006 count
- Owner
- County
- County Highway Agency
About this bridge
Grant RD over Branch-E.Fk.Rockhouse CR is a steel stringer/multi-beam or girder carrying Grant RD over Branch-E.Fk.Rockhouse CR in Calloway County, Kentucky. It was built in 1979, so it is 46 years old, younger than the Kentucky average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 32 vehicles a day, projected to reach 39 by 2026. The structure is 30 ft (9.1 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grant RD over Branch-E.Fk.Rockhouse CR built?
It was built in 1979, making it 46 years old in 2025.
What condition is Grant RD over Branch-E.Fk.Rockhouse CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Grant RD over Branch-E.Fk.Rockhouse CR carry?
About 32 vehicles per day (2006 count).
How long is Grant RD over Branch-E.Fk.Rockhouse CR?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 24 ft wide.
Who owns Grant RD over Branch-E.Fk.Rockhouse CR?
It is owned by the County Highway Agency.