I-275 WB over Elijah Creek Road
FairBoone County, Kentucky · 1 Mi.Ne. Hebron Ky · Structure no. 008B00087L
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected June 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 118 ft
- 3 main spans
- Daily traffic
- 30,673
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-275 WB over Elijah Creek Road is a prestressed concrete stringer/multi-beam or girder carrying I-275 WB over Elijah Creek Road in Boone County, Kentucky. It was built in 2000, so it is 25 years old, younger than the Kentucky average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 30,673 vehicles a day, roughly 16% of them trucks, projected to reach 33,740 by 2043. The structure is 118 ft (36 m) long and 59 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-275 WB over Elijah Creek Road built?
It was built in 2000, making it 25 years old in 2025.
What condition is I-275 WB over Elijah Creek Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2021.
How much traffic does I-275 WB over Elijah Creek Road carry?
About 30,673 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is I-275 WB over Elijah Creek Road?
The structure is 118 ft (36 m) long with a longest span of 55 ft (16.8 m) and a deck 59 ft wide.
Who owns I-275 WB over Elijah Creek Road?
It is owned by the State Highway Agency.