WB I70-NBND Fairfx over 7 UP R.R Tracks
FairPosted for loadWyandotte County, Kansas · 0.49 Miles W Mo ST Line · Structure no. 999907001051731
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,664 ft
- 10 main spans
- Daily traffic
- 5,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
WB I70-NBND Fairfx over 7 UP R.R Tracks is a steel stringer/multi-beam or girder carrying WB I70-NBND Fairfx over 7 UP R.R Tracks in Wyandotte County, Kansas. It was built in 1962, so it is 63 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 5,500 vehicles a day. The structure is 1,664 ft (507.2 m) long and 22 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB I70-NBND Fairfx over 7 UP R.R Tracks built?
It was built in 1962, making it 63 years old in 2025.
What condition is WB I70-NBND Fairfx over 7 UP R.R Tracks in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does WB I70-NBND Fairfx over 7 UP R.R Tracks carry?
About 5,500 vehicles per day (2023 count).
How long is WB I70-NBND Fairfx over 7 UP R.R Tracks?
The structure is 1,664 ft (507.2 m) long with a longest span of 300 ft (91.4 m) and a deck 22 ft wide.
Who owns WB I70-NBND Fairfx over 7 UP R.R Tracks?
It is owned by the State Highway Agency.