US Bridges

I-70 EB Highway over Park DR RR Service RD

Good

Wyandotte County, Kansas · 0.38 MI E I70/I635 JCT · Structure no. 999907001051671

Built
1956
69 years old, rebuilt 2015
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
828 ft
9 main spans
Daily traffic
44,100
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

I-70 EB Highway over Park DR RR Service RD is a steel continuous stringer/multi-beam or girder carrying I-70 EB Highway over Park DR RR Service RD in Wyandotte County, Kansas. It was built in 1956 and reconstructed in 2015, so it is 69 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 44,100 vehicles a day, roughly 9% of them trucks, projected to reach 52,755 by 2044. The structure is 828 ft (252.3 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-70 EB Highway
CrossesPark DR RR Service RD
Location0.38 MI E I70/I635 JCT
RouteInterstate 70
StateKansas
Coordinates39.10083, -94.67111
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53 US tons
Inventory rating32 US tons

Structure

MaterialSteel Continuous
DeckNot applicable
Main spans9
Design loadHS 20 + Mod
Structure length828 ft (252.3 m)
Longest span121 ft (36.9 m)
Deck width63 ft (19.1 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44,100 (2023)
Projected traffic52,755 by 2044
Trucks9%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-70 EB Highway over Park DR RR Service RD built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2015.

What condition is I-70 EB Highway over Park DR RR Service RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I-70 EB Highway over Park DR RR Service RD carry?

About 44,100 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-70 EB Highway over Park DR RR Service RD?

The structure is 828 ft (252.3 m) long with a longest span of 121 ft (36.9 m) and a deck 63 ft wide.

Who owns I-70 EB Highway over Park DR RR Service RD?

It is owned by the State Toll Authority and maintained by the State Highway Agency.