U-40 HWY over Union Pacific Railroad
GoodWallace County, Kansas · 9.73 MI E Colorado Line · Structure no. 999904001000201
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 286 ft
- 3 main spans
- Daily traffic
- 1,040
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
U-40 HWY over Union Pacific Railroad is a steel continuous stringer/multi-beam or girder carrying U-40 HWY over Union Pacific Railroad in Wallace County, Kansas. It was built in 2024, so it is 1 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,040 vehicles a day, roughly 24% of them trucks, projected to reach 1,320 by 2044. The structure is 286 ft (87.3 m) long and 38 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was U-40 HWY over Union Pacific Railroad built?
It was built in 2024, making it 1 years old in 2025.
What condition is U-40 HWY over Union Pacific Railroad in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does U-40 HWY over Union Pacific Railroad carry?
About 1,040 vehicles per day (2023 count), of which roughly 24% are trucks.
How long is U-40 HWY over Union Pacific Railroad?
The structure is 286 ft (87.3 m) long with a longest span of 136 ft (41.6 m) and a deck 38 ft wide.
Who owns U-40 HWY over Union Pacific Railroad?
It is owned by the State Highway Agency.