US Bridges

E. 100th St. S. over Trib. to Slate Creek

Good

Sumner County, Kansas · 4.0N 2.3W of Ashton · Structure no. 000960825706940

Built
2009
16 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
25 ft
1 main span
Daily traffic
10
2013 count
Owner
County
County Highway Agency

About this bridge

E. 100th St. S. over Trib. to Slate Creek is a steel stringer/multi-beam or girder carrying E. 100th St. S. over Trib. to Slate Creek in Sumner County, Kansas. It was built in 2009, so it is 16 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 2% of them trucks, projected to reach 12 by 2043. The structure is 25 ft (7.7 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE. 100th St. S.
CrossesTrib. to Slate Creek
Location4.0N 2.3W of Ashton
RouteCounty Highway 0
StateKansas
Coordinates37.14486, -97.28141
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating34.2 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadUnknown
Structure length25 ft (7.7 m)
Longest span25 ft (7.6 m)
Deck width24 ft (7.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic10 (2013)
Projected traffic12 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E. 100th St. S. over Trib. to Slate Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is E. 100th St. S. over Trib. to Slate Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does E. 100th St. S. over Trib. to Slate Creek carry?

About 10 vehicles per day (2013 count), of which roughly 2% are trucks.

How long is E. 100th St. S. over Trib. to Slate Creek?

The structure is 25 ft (7.7 m) long with a longest span of 25 ft (7.6 m) and a deck 24 ft wide.

Who owns E. 100th St. S. over Trib. to Slate Creek?

It is owned by the County Highway Agency.