US Bridges

10 N over Trib South Fork Solomon

FairPosted for load

Sheridan County, Kansas · 0.5N 8.1E of Hoxie · Structure no. 000900503103880

Built
1962
63 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
32 ft
1 main span
Daily traffic
30
2020 count
Owner
County
County Highway Agency

About this bridge

10 N over Trib South Fork Solomon is a steel stringer/multi-beam or girder carrying 10 N over Trib South Fork Solomon in Sheridan County, Kansas. It was built in 1962, so it is 63 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 30 vehicles a day, projected to reach 40 by 2044. The structure is 32 ft (9.8 m) long and 22 ft wide. If it were closed, the detour would be 5 mi (8 km).

Carries10 N
CrossesTrib South Fork Solomon
Location0.5N 8.1E of Hoxie
RouteCounty Highway 0
StateKansas
Coordinates39.36408, -100.29268
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating17.5 US tons
Inventory rating10.5 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadH 10
Structure length32 ft (9.8 m)
Longest span30 ft (9.2 m)
Deck width22 ft (6.7 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic30 (2020)
Projected traffic40 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$180,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 10 N over Trib South Fork Solomon built?

It was built in 1962, making it 63 years old in 2025.

What condition is 10 N over Trib South Fork Solomon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does 10 N over Trib South Fork Solomon carry?

About 30 vehicles per day (2020 count).

How long is 10 N over Trib South Fork Solomon?

The structure is 32 ft (9.8 m) long with a longest span of 30 ft (9.2 m) and a deck 22 ft wide.

Who owns 10 N over Trib South Fork Solomon?

It is owned by the County Highway Agency.