US Bridges

US-75 HWY SB over 35th Street

Good

Shawnee County, Kansas · 1.42 MI N U24/U75 JCT · Structure no. 999907500892641

Built
2000
25 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
190 ft
3 main spans
Daily traffic
13,109
2023 count
Owner
State
State Highway Agency

About this bridge

US-75 HWY SB over 35th Street is a prestressed concrete continuous stringer/multi-beam or girder carrying US-75 HWY SB over 35th Street in Shawnee County, Kansas. It was built in 2000, so it is 25 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,109 vehicles a day, roughly 7% of them trucks, projected to reach 13,374 by 2044. The structure is 190 ft (57.8 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS-75 HWY SB
Crosses35th Street
Location1.42 MI N U24/U75 JCT
RouteU.S. Route 75
StateKansas
Coordinates39.10917, -95.72056
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating53.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckNot applicable
Main spans3
Design loadHS 25 or greater
Structure length190 ft (57.8 m)
Longest span95 ft (29 m)
Deck width53 ft (16.1 m)
Roadway width50 ft (15.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,109 (2023)
Projected traffic13,374 by 2044
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US-75 HWY SB over 35th Street built?

It was built in 2000, making it 25 years old in 2025.

What condition is US-75 HWY SB over 35th Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does US-75 HWY SB over 35th Street carry?

About 13,109 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is US-75 HWY SB over 35th Street?

The structure is 190 ft (57.8 m) long with a longest span of 95 ft (29 m) and a deck 53 ft wide.

Who owns US-75 HWY SB over 35th Street?

It is owned by the State Highway Agency.