US24 HWY EB over Soldier CR New Chan
FairShawnee County, Kansas · 1.95 MI E Topeka Ave EB · Structure no. 999902400890854
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected May 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 6,977
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US24 HWY EB over Soldier CR New Chan is a concrete continuous tee beam carrying US24 HWY EB over Soldier CR New Chan in Shawnee County, Kansas. It was built in 1958, so it is 67 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,977 vehicles a day, roughly 11% of them trucks, projected to reach 7,261 by 2044. The structure is 240 ft (73.3 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US24 HWY EB over Soldier CR New Chan built?
It was built in 1958, making it 67 years old in 2025.
What condition is US24 HWY EB over Soldier CR New Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does US24 HWY EB over Soldier CR New Chan carry?
About 6,977 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is US24 HWY EB over Soldier CR New Chan?
The structure is 240 ft (73.3 m) long with a longest span of 98 ft (29.9 m) and a deck 33 ft wide.
Who owns US24 HWY EB over Soldier CR New Chan?
It is owned by the State Highway Agency.