US Bridges

Elmont RD over Trib. to Halfday Creek

FairPosted for load

Shawnee County, Kansas · 0.2N of Elmont · Structure no. 000890993804144

Built
1934
91 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
23 ft
1 main span
Daily traffic
200
2024 count
Owner
County
County Highway Agency

About this bridge

Elmont RD over Trib. to Halfday Creek is a steel stringer/multi-beam or girder carrying Elmont RD over Trib. to Halfday Creek in Shawnee County, Kansas. It was built in 1934, so it is 91 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 200 vehicles a day, projected to reach 200 by 2040. The structure is 23 ft (7 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesElmont RD
CrossesTrib. to Halfday Creek
Location0.2N of Elmont
RouteCounty Highway 0
StateKansas
Coordinates39.16808, -95.70457
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating26.3 US tons
Inventory rating15.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length23 ft (7 m)
Longest span21 ft (6.4 m)
Deck width23 ft (6.9 m)
Roadway width21 ft (6.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic200 (2024)
Projected traffic200 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Elmont RD over Trib. to Halfday Creek built?

It was built in 1934, making it 91 years old in 2025.

What condition is Elmont RD over Trib. to Halfday Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Elmont RD over Trib. to Halfday Creek carry?

About 200 vehicles per day (2024 count).

How long is Elmont RD over Trib. to Halfday Creek?

The structure is 23 ft (7 m) long with a longest span of 21 ft (6.4 m) and a deck 23 ft wide.

Who owns Elmont RD over Trib. to Halfday Creek?

It is owned by the County Highway Agency.