US Bridges

N.W. Fielding 282 over Trib. to Halfday Ck.

Good

Shawnee County, Kansas · 0.3N 46th St. 0.3E US75 · Structure no. 000890933304188

Built
2000
25 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
26 ft
3 main spans
Daily traffic
500
2024 count
Owner
County
County Highway Agency

About this bridge

N.W. Fielding 282 over Trib. to Halfday Ck. is a concrete culvert carrying N.W. Fielding 282 over Trib. to Halfday Ck. in Shawnee County, Kansas. It was built in 2000, so it is 25 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 1% of them trucks, projected to reach 750 by 2040. The structure is 26 ft (8 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN.W. Fielding 282
CrossesTrib. to Halfday Ck.
Location0.3N 46th St. 0.3E US75
RouteCounty Highway 0
StateKansas
Coordinates39.13251, -95.71443
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating42.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length26 ft (8 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic500 (2024)
Projected traffic750 by 2040
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N.W. Fielding 282 over Trib. to Halfday Ck. built?

It was built in 2000, making it 25 years old in 2025.

What condition is N.W. Fielding 282 over Trib. to Halfday Ck. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does N.W. Fielding 282 over Trib. to Halfday Ck. carry?

About 500 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is N.W. Fielding 282 over Trib. to Halfday Ck.?

The structure is 26 ft (8 m) long with a longest span of 8 ft (2.4 m).

Who owns N.W. Fielding 282 over Trib. to Halfday Ck.?

It is owned by the County Highway Agency.