US Bridges

Rs 2076 201-A over Wakarusa River

Good

Shawnee County, Kansas · 1.2S 7.0E of Auburn · Structure no. 000000000890631

Built
2024
1 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
298 ft
4 main spans
Daily traffic
2,015
2020 count
Owner
County
County Highway Agency

About this bridge

Rs 2076 201-A over Wakarusa River is a prestressed concrete continuous stringer/multi-beam or girder carrying Rs 2076 201-A over Wakarusa River in Shawnee County, Kansas. It was built in 2024, so it is 1 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,015 vehicles a day, roughly 1% of them trucks, projected to reach 2,200 by 2045. The structure is 298 ft (90.8 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRs 2076 201-A
CrossesWakarusa River
Location1.2S 7.0E of Auburn
RouteCounty Highway 2076
StateKansas
Coordinates38.8907, -95.68744
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.6 US tons
Inventory rating46.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length298 ft (90.8 m)
Longest span100 ft (30.4 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic2,015 (2020)
Projected traffic2,200 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rs 2076 201-A over Wakarusa River built?

It was built in 2024, making it 1 years old in 2025.

What condition is Rs 2076 201-A over Wakarusa River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Rs 2076 201-A over Wakarusa River carry?

About 2,015 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Rs 2076 201-A over Wakarusa River?

The structure is 298 ft (90.8 m) long with a longest span of 100 ft (30.4 m) and a deck 34 ft wide.

Who owns Rs 2076 201-A over Wakarusa River?

It is owned by the County Highway Agency.