US54/US400 HWY EB over Fourmile Creek Drainage
GoodSedgwick County, Kansas · 0.90 MI E 143rd ST EB · Structure no. 999905400873681
- Built
- 1990
- 35 years old, rebuilt 2012
- Condition
- Good
- inspected October 2024
- Type
- Slab
- Concrete Continuous
- Length
- 113 ft
- 3 main spans
- Daily traffic
- 16,450
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US54/US400 HWY EB over Fourmile Creek Drainage is a concrete continuous slab carrying US54/US400 HWY EB over Fourmile Creek Drainage in Sedgwick County, Kansas. It was built in 1990 and reconstructed in 2012, so it is 35 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,450 vehicles a day, roughly 8% of them trucks, projected to reach 24,444 by 2044. The structure is 113 ft (34.3 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US54/US400 HWY EB over Fourmile Creek Drainage built?
It was built in 1990, making it 35 years old in 2025. It was reconstructed in 2012.
What condition is US54/US400 HWY EB over Fourmile Creek Drainage in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does US54/US400 HWY EB over Fourmile Creek Drainage carry?
About 16,450 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is US54/US400 HWY EB over Fourmile Creek Drainage?
The structure is 113 ft (34.3 m) long with a longest span of 44 ft (13.4 m) and a deck 50 ft wide.
Who owns US54/US400 HWY EB over Fourmile Creek Drainage?
It is owned by the State Highway Agency.