I-35 HWY SB (kta) over 55th ST South
FairClosed to trafficSedgwick County, Kansas · 8.08 MI N Sumner CO Line · Structure no. 999903500872313
- Built
- 1956
- 69 years old, rebuilt 1973
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 157 ft
- 3 main spans
- Daily traffic
- 13,874
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
I-35 HWY SB (kta) over 55th ST South is a steel continuous stringer/multi-beam or girder carrying I-35 HWY SB (kta) over 55th ST South in Sedgwick County, Kansas. It was built in 1956 and reconstructed in 1973, so it is 69 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.
It carries about 13,874 vehicles a day, roughly 23% of them trucks, projected to reach 18,686 by 2044. The structure is 157 ft (47.9 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-35 HWY SB (kta) over 55th ST South built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1973.
What condition is I-35 HWY SB (kta) over 55th ST South in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does I-35 HWY SB (kta) over 55th ST South carry?
About 13,874 vehicles per day (2023 count), of which roughly 23% are trucks.
How long is I-35 HWY SB (kta) over 55th ST South?
The structure is 157 ft (47.9 m) long with a longest span of 88 ft (26.8 m) and a deck 33 ft wide.
Who owns I-35 HWY SB (kta) over 55th ST South?
It is owned by the State Toll Authority.