US Bridges

199th Local Rd. over Trib. to Cowskin Creek

Good

Sedgwick County, Kansas · 199THW 0.7 N of 53RDN · Structure no. 000870795006043

Built
1988
37 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
20
2022 count
Owner
County
County Highway Agency

About this bridge

199th Local Rd. over Trib. to Cowskin Creek is a concrete culvert carrying 199th Local Rd. over Trib. to Cowskin Creek in Sedgwick County, Kansas. It was built in 1988, so it is 37 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, projected to reach 30 by 2044. The structure is 33 ft (10.1 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries199th Local Rd.
CrossesTrib. to Cowskin Creek
Location199THW 0.7 N of 53RDN
RouteCounty Highway 0
StateKansas
Coordinates37.78997, -97.57276
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating71.8 US tons
Inventory rating43 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span11 ft (3.4 m)
Deck width30 ft (9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic20 (2022)
Projected traffic30 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 199th Local Rd. over Trib. to Cowskin Creek built?

It was built in 1988, making it 37 years old in 2025.

What condition is 199th Local Rd. over Trib. to Cowskin Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does 199th Local Rd. over Trib. to Cowskin Creek carry?

About 20 vehicles per day (2022 count).

How long is 199th Local Rd. over Trib. to Cowskin Creek?

The structure is 33 ft (10.1 m) long with a longest span of 11 ft (3.4 m) and a deck 30 ft wide.

Who owns 199th Local Rd. over Trib. to Cowskin Creek?

It is owned by the County Highway Agency.