(fau) 458.5-795.3 over Smoky Hill River
GoodSaline County, Kansas · 2.0E 0.5N of Salina · Structure no. 000850795304585
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 254 ft
- 3 main spans
- Daily traffic
- 1,070
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
(fau) 458.5-795.3 over Smoky Hill River is a prestressed concrete continuous stringer/multi-beam or girder carrying (fau) 458.5-795.3 over Smoky Hill River in Saline County, Kansas. It was built in 1982, so it is 43 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,070 vehicles a day, roughly 8% of them trucks, projected to reach 1,313 by 2043. The structure is 254 ft (77.5 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was (fau) 458.5-795.3 over Smoky Hill River built?
It was built in 1982, making it 43 years old in 2025.
What condition is (fau) 458.5-795.3 over Smoky Hill River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does (fau) 458.5-795.3 over Smoky Hill River carry?
About 1,070 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is (fau) 458.5-795.3 over Smoky Hill River?
The structure is 254 ft (77.5 m) long with a longest span of 90 ft (27.4 m) and a deck 30 ft wide.
Who owns (fau) 458.5-795.3 over Smoky Hill River?
It is owned by the County Highway Agency.