2 Road (rs 582) over South Fork Solomon River
FairRooks County, Kansas · 3.7N of Damar · Structure no. 000000000820010
- Built
- 1953
- 72 years old, rebuilt 2017
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 473 ft
- 6 main spans
- Daily traffic
- 180
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
2 Road (rs 582) over South Fork Solomon River is a steel continuous stringer/multi-beam or girder carrying 2 Road (rs 582) over South Fork Solomon River in Rooks County, Kansas. It was built in 1953 and reconstructed in 2017, so it is 72 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 180 vehicles a day, roughly 10% of them trucks, projected to reach 200 by 2044. The structure is 473 ft (144.3 m) long and 26 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2 Road (rs 582) over South Fork Solomon River built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 2017.
What condition is 2 Road (rs 582) over South Fork Solomon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does 2 Road (rs 582) over South Fork Solomon River carry?
About 180 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is 2 Road (rs 582) over South Fork Solomon River?
The structure is 473 ft (144.3 m) long with a longest span of 85 ft (25.9 m) and a deck 26 ft wide.
Who owns 2 Road (rs 582) over South Fork Solomon River?
It is owned by the County Highway Agency.