US Bridges

Local RD 23-U.9 over Turkey Creek

Good

Republic County, Kansas · 4.5W .1N of Agenda · Structure no. 000790801003389

Built
2012
13 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete
Length
30 ft
1 main span
Daily traffic
25
2018 count
Owner
County
County Highway Agency

About this bridge

Local RD 23-U.9 over Turkey Creek is a concrete slab carrying Local RD 23-U.9 over Turkey Creek in Republic County, Kansas. It was built in 2012, so it is 13 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 35 by 2044. The structure is 30 ft (9.1 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesLocal RD 23-U.9
CrossesTurkey Creek
Location4.5W .1N of Agenda
RouteCounty Highway 0
StateKansas
Coordinates39.71328, -97.51849
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span28 ft (8.5 m)
Deck width26 ft (7.8 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic25 (2018)
Projected traffic35 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Local RD 23-U.9 over Turkey Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is Local RD 23-U.9 over Turkey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Local RD 23-U.9 over Turkey Creek carry?

About 25 vehicles per day (2018 count).

How long is Local RD 23-U.9 over Turkey Creek?

The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 26 ft wide.

Who owns Local RD 23-U.9 over Turkey Creek?

It is owned by the County Highway Agency.