US Bridges

Rs 334 over Courtland Canal

FairPosted for load

Republic County, Kansas · 0.5N 3.0W of Republic · Structure no. 000000000790040

Built
1957
68 years old
Condition
Fair
inspected June 2024
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
185
2018 count
Owner
County
County Highway Agency

About this bridge

Rs 334 over Courtland Canal is a concrete culvert carrying Rs 334 over Courtland Canal in Republic County, Kansas. It was built in 1957, so it is 68 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 185 vehicles a day, projected to reach 222 by 2044. The structure is 23 ft (7 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRs 334
CrossesCourtland Canal
Location0.5N 3.0W of Republic
RouteCounty Highway 334
StateKansas
Coordinates39.92904, -97.88157
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.4 US tons
Inventory rating16.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 15
Structure length23 ft (7 m)
Longest span11 ft (3.4 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic185 (2018)
Projected traffic222 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$210,000 (2018 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Rs 334 over Courtland Canal built?

It was built in 1957, making it 68 years old in 2025.

What condition is Rs 334 over Courtland Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Rs 334 over Courtland Canal carry?

About 185 vehicles per day (2018 count).

How long is Rs 334 over Courtland Canal?

The structure is 23 ft (7 m) long with a longest span of 11 ft (3.4 m) and a deck 28 ft wide.

Who owns Rs 334 over Courtland Canal?

It is owned by the County Highway Agency.