US Bridges

Hoagland Street over East Side Drain

Good

Reno County, Kansas · Hoagland St. & E.S.D. · Structure no. 51350078000BE46

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
650
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hoagland Street over East Side Drain is a concrete culvert carrying Hoagland Street over East Side Drain in Reno County, Kansas. It was built in 2024, so it is 1 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 650 vehicles a day, roughly 10% of them trucks, projected to reach 715 by 2046. The structure is 38 ft (11.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHoagland Street
CrossesEast Side Drain
LocationHoagland St. & E.S.D.
RouteCity Street 480
StateKansas
Coordinates38.06033, -97.90179
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.3 US tons
Inventory rating60.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length38 ft (11.5 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic650 (2015)
Projected traffic715 by 2046
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hoagland Street over East Side Drain built?

It was built in 2024, making it 1 years old in 2025.

What condition is Hoagland Street over East Side Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Hoagland Street over East Side Drain carry?

About 650 vehicles per day (2015 count), of which roughly 10% are trucks.

How long is Hoagland Street over East Side Drain?

The structure is 38 ft (11.5 m) long with a longest span of 12 ft (3.6 m).

Who owns Hoagland Street over East Side Drain?

It is owned by the City or Municipal Highway Agency.