Baker Street over East Side Drain

Good

Reno County, Kansas · Baker ST @ 16th Ave · Structure no. 51350078000BE32

Built
2023
2 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
41 ft
2 main spans
Daily traffic
200
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Baker Street over East Side Drain is a concrete culvert carrying Baker Street over East Side Drain in Reno County, Kansas. It was built in 2023, so it is 2 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 220 by 2046. The structure is 41 ft (12.4 m) long.

CarriesBaker Street
CrossesEast Side Drain
LocationBaker ST @ 16th Ave
RouteCity Street 19
StateKansas
Coordinates38.07061, -97.91086
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating50 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length41 ft (12.4 m)
Longest span20 ft (6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic200 (2015)
Projected traffic220 by 2046
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Baker Street over East Side Drain built?

It was built in 2023, making it 2 years old in 2025.

What condition is Baker Street over East Side Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Baker Street over East Side Drain carry?

About 200 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Baker Street over East Side Drain?

The structure is 41 ft (12.4 m) long with a longest span of 20 ft (6 m).

Who owns Baker Street over East Side Drain?

It is owned by the City or Municipal Highway Agency.