Sun City RD 29.25 over Drain
FairPosted for loadReno County, Kansas · 0.8E 4.0S of Castleton · Structure no. 000780753306020
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 39 ft
- 2 main spans
- Daily traffic
- 10
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Sun City RD 29.25 over Drain is a wood or timber stringer/multi-beam or girder carrying Sun City RD 29.25 over Drain in Reno County, Kansas. It was built in 1967, so it is 58 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, roughly 2% of them trucks, projected to reach 10 by 2046. The structure is 39 ft (12 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sun City RD 29.25 over Drain built?
It was built in 1967, making it 58 years old in 2025.
What condition is Sun City RD 29.25 over Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Sun City RD 29.25 over Drain carry?
About 10 vehicles per day (2021 count), of which roughly 2% are trucks.
How long is Sun City RD 29.25 over Drain?
The structure is 39 ft (12 m) long with a longest span of 19 ft (5.7 m) and a deck 22 ft wide.
Who owns Sun City RD 29.25 over Drain?
It is owned by the County Highway Agency.