US Bridges

Smoots Ck RD.22.75 over Drain

FairPosted for load

Reno County, Kansas · 3.3S 2.5W Pretty Prairie · Structure no. 000780739806120

Built
1963
62 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
39 ft
2 main spans
Daily traffic
12
2021 count
Owner
County
County Highway Agency

About this bridge

Smoots Ck RD.22.75 over Drain is a wood or timber stringer/multi-beam or girder carrying Smoots Ck RD.22.75 over Drain in Reno County, Kansas. It was built in 1963, so it is 62 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 12 vehicles a day, roughly 5% of them trucks, projected to reach 20 by 2046. The structure is 39 ft (12 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSmoots Ck RD.22.75
CrossesDrain
Location3.3S 2.5W Pretty Prairie
RouteCounty Highway 0
StateKansas
Coordinates37.73321, -98.06737
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating17.6 US tons
Inventory rating11.4 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans2 (+1 approach)
Design loadUnknown
Structure length39 ft (12 m)
Longest span19 ft (5.7 m)
Deck width22 ft (6.7 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic12 (2021)
Projected traffic20 by 2046
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$260,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Smoots Ck RD.22.75 over Drain built?

It was built in 1963, making it 62 years old in 2025.

What condition is Smoots Ck RD.22.75 over Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Smoots Ck RD.22.75 over Drain carry?

About 12 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Smoots Ck RD.22.75 over Drain?

The structure is 39 ft (12 m) long with a longest span of 19 ft (5.7 m) and a deck 22 ft wide.

Who owns Smoots Ck RD.22.75 over Drain?

It is owned by the County Highway Agency.