US Bridges

Rs 556 5901755 over N. Fork Ninnescah River

Good

Reno County, Kansas · At Arlington · Structure no. 00000000078B330

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
198 ft
4 main spans
Daily traffic
330
2022 count
Owner
County
County Highway Agency

About this bridge

Rs 556 5901755 over N. Fork Ninnescah River is a concrete continuous slab carrying Rs 556 5901755 over N. Fork Ninnescah River in Reno County, Kansas. It was built in 2022, so it is 3 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 330 vehicles a day, projected to reach 395 by 2046. The structure is 198 ft (60.5 m) long and 30 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesRs 556 5901755
CrossesN. Fork Ninnescah River
LocationAt Arlington
RouteCounty Highway 556
StateKansas
Coordinates37.89639, -98.17097
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating92.2 US tons
Inventory rating48.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length198 ft (60.5 m)
Longest span56 ft (17 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic330 (2022)
Projected traffic395 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rs 556 5901755 over N. Fork Ninnescah River built?

It was built in 2022, making it 3 years old in 2025.

What condition is Rs 556 5901755 over N. Fork Ninnescah River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Rs 556 5901755 over N. Fork Ninnescah River carry?

About 330 vehicles per day (2022 count).

How long is Rs 556 5901755 over N. Fork Ninnescah River?

The structure is 198 ft (60.5 m) long with a longest span of 56 ft (17 m) and a deck 30 ft wide.

Who owns Rs 556 5901755 over N. Fork Ninnescah River?

It is owned by the County Highway Agency.