US Bridges

Rs 548 7031499 over N. Fork Ninnescah River

Good

Reno County, Kansas · 0.5W 1.0S of Sylvia · Structure no. 00000000078B200

Built
2023
2 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
142 ft
3 main spans
Daily traffic
260
2020 count
Owner
County
County Highway Agency

About this bridge

Rs 548 7031499 over N. Fork Ninnescah River is a concrete continuous slab carrying Rs 548 7031499 over N. Fork Ninnescah River in Reno County, Kansas. It was built in 2023, so it is 2 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 260 vehicles a day, roughly 18% of them trucks, projected to reach 310 by 2043. The structure is 142 ft (43.4 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRs 548 7031499
CrossesN. Fork Ninnescah River
Location0.5W 1.0S of Sylvia
RouteCounty Highway 548
StateKansas
Coordinates37.94103, -98.41742
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating49.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length142 ft (43.4 m)
Longest span56 ft (17 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic260 (2020)
Projected traffic310 by 2043
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rs 548 7031499 over N. Fork Ninnescah River built?

It was built in 2023, making it 2 years old in 2025.

What condition is Rs 548 7031499 over N. Fork Ninnescah River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Rs 548 7031499 over N. Fork Ninnescah River carry?

About 260 vehicles per day (2020 count), of which roughly 18% are trucks.

How long is Rs 548 7031499 over N. Fork Ninnescah River?

The structure is 142 ft (43.4 m) long with a longest span of 56 ft (17 m) and a deck 30 ft wide.

Who owns Rs 548 7031499 over N. Fork Ninnescah River?

It is owned by the County Highway Agency.