Rs 39 - NE 100 Ave over S. Fork Ninnescah River
FairPosted for loadPratt County, Kansas · 0.8N of Cairo · Structure no. 000000000760060
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected November 2024
- Type
- Slab
- Concrete Continuous
- Length
- 224 ft
- 6 main spans
- Daily traffic
- 315
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Rs 39 - NE 100 Ave over S. Fork Ninnescah River is a concrete continuous slab carrying Rs 39 - NE 100 Ave over S. Fork Ninnescah River in Pratt County, Kansas. It was built in 1967, so it is 58 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 315 vehicles a day, roughly 10% of them trucks, projected to reach 380 by 2046. The structure is 224 ft (68.2 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rs 39 - NE 100 Ave over S. Fork Ninnescah River built?
It was built in 1967, making it 58 years old in 2025.
What condition is Rs 39 - NE 100 Ave over S. Fork Ninnescah River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Rs 39 - NE 100 Ave over S. Fork Ninnescah River carry?
About 315 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Rs 39 - NE 100 Ave over S. Fork Ninnescah River?
The structure is 224 ft (68.2 m) long with a longest span of 40 ft (12.1 m) and a deck 32 ft wide.
Who owns Rs 39 - NE 100 Ave over S. Fork Ninnescah River?
It is owned by the County Highway Agency.