W Big Bear Ln. (8) over Trib. N. Fork Solomon
FairPosted for loadPhillips County, Kansas · 3.5S 2.5W of Logan · Structure no. 000740577703543
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 26 ft
- 1 main span
- Daily traffic
- 10
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
W Big Bear Ln. (8) over Trib. N. Fork Solomon is a steel stringer/multi-beam or girder carrying W Big Bear Ln. (8) over Trib. N. Fork Solomon in Phillips County, Kansas. It was built in 1955, so it is 70 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, projected to reach 10 by 2044. The structure is 26 ft (7.9 m) long and 16 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Big Bear Ln. (8) over Trib. N. Fork Solomon built?
It was built in 1955, making it 70 years old in 2025.
What condition is W Big Bear Ln. (8) over Trib. N. Fork Solomon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does W Big Bear Ln. (8) over Trib. N. Fork Solomon carry?
About 10 vehicles per day (2020 count).
How long is W Big Bear Ln. (8) over Trib. N. Fork Solomon?
The structure is 26 ft (7.9 m) long with a longest span of 23 ft (7.1 m) and a deck 16 ft wide.
Who owns W Big Bear Ln. (8) over Trib. N. Fork Solomon?
It is owned by the County Highway Agency.