E Hunter (rs 851) over Trib to West Cedar Creek
FairPhillips County, Kansas · 9.0N 8.0E Phillipsburg · Structure no. 000000000740360
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 36 ft
- 2 main spans
- Daily traffic
- 50
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
E Hunter (rs 851) over Trib to West Cedar Creek is a steel continuous stringer/multi-beam or girder carrying E Hunter (rs 851) over Trib to West Cedar Creek in Phillips County, Kansas. It was built in 1954, so it is 71 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 60 by 2044. The structure is 36 ft (10.9 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Hunter (rs 851) over Trib to West Cedar Creek built?
It was built in 1954, making it 71 years old in 2025.
What condition is E Hunter (rs 851) over Trib to West Cedar Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does E Hunter (rs 851) over Trib to West Cedar Creek carry?
About 50 vehicles per day (2020 count).
How long is E Hunter (rs 851) over Trib to West Cedar Creek?
The structure is 36 ft (10.9 m) long with a longest span of 17 ft (5.1 m) and a deck 24 ft wide.
Who owns E Hunter (rs 851) over Trib to West Cedar Creek?
It is owned by the County Highway Agency.