S Morril RD 4 over Salt Creek
GoodPosted for loadOsage County, Kansas · 1.0W 0.5S of Lyndon · Structure no. 000700995004925
- Built
- 1973
- 52 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 200 ft
- 3 main spans
- Daily traffic
- 60
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
S Morril RD 4 over Salt Creek is a steel continuous stringer/multi-beam or girder carrying S Morril RD 4 over Salt Creek in Osage County, Kansas. It was built in 1973, so it is 52 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 60 vehicles a day, projected to reach 72 by 2044. The structure is 200 ft (61 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Morril RD 4 over Salt Creek built?
It was built in 1973, making it 52 years old in 2025.
What condition is S Morril RD 4 over Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does S Morril RD 4 over Salt Creek carry?
About 60 vehicles per day (2019 count).
How long is S Morril RD 4 over Salt Creek?
The structure is 200 ft (61 m) long with a longest span of 76 ft (23.1 m) and a deck 23 ft wide.
Who owns S Morril RD 4 over Salt Creek?
It is owned by the County Highway Agency.