US Bridges

S Davis RD 19 over Plum Creek

Fair

Osage County, Kansas · 3.5W 2.8S of Burlingame · Structure no. 000700973004768

Built
1950
75 years old
Condition
Fair
inspected December 2024
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
30
2019 count
Owner
County
County Highway Agency

About this bridge

S Davis RD 19 over Plum Creek is a concrete culvert carrying S Davis RD 19 over Plum Creek in Osage County, Kansas. It was built in 1950, so it is 75 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30 vehicles a day, projected to reach 36 by 2044. The structure is 21 ft (6.4 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesS Davis RD 19
CrossesPlum Creek
Location3.5W 2.8S of Burlingame
RouteCounty Highway 7005
StateKansas
Coordinates38.71327, -95.90875
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width24 ft (7.3 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic30 (2019)
Projected traffic36 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S Davis RD 19 over Plum Creek built?

It was built in 1950, making it 75 years old in 2025.

What condition is S Davis RD 19 over Plum Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does S Davis RD 19 over Plum Creek carry?

About 30 vehicles per day (2019 count).

How long is S Davis RD 19 over Plum Creek?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m) and a deck 24 ft wide.

Who owns S Davis RD 19 over Plum Creek?

It is owned by the County Highway Agency.