US Bridges

Rs 499 40-22.2 over Trib. to Neosho River

Good

Neosho County, Kansas · 7.2S of St. Paul · Structure no. 000000000670280

Built
1983
42 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete Continuous
Length
82 ft
3 main spans
Daily traffic
55
2019 count
Owner
County
County Highway Agency

About this bridge

Rs 499 40-22.2 over Trib. to Neosho River is a concrete continuous slab carrying Rs 499 40-22.2 over Trib. to Neosho River in Neosho County, Kansas. It was built in 1983, so it is 42 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55 vehicles a day, projected to reach 82 by 2044. The structure is 82 ft (25 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesRs 499 40-22.2
CrossesTrib. to Neosho River
Location7.2S of St. Paul
RouteCounty Highway 499
StateKansas
Coordinates37.41025, -95.17916
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length82 ft (25 m)
Longest span32 ft (9.7 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic55 (2019)
Projected traffic82 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rs 499 40-22.2 over Trib. to Neosho River built?

It was built in 1983, making it 42 years old in 2025.

What condition is Rs 499 40-22.2 over Trib. to Neosho River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Rs 499 40-22.2 over Trib. to Neosho River carry?

About 55 vehicles per day (2019 count).

How long is Rs 499 40-22.2 over Trib. to Neosho River?

The structure is 82 ft (25 m) long with a longest span of 32 ft (9.7 m) and a deck 28 ft wide.

Who owns Rs 499 40-22.2 over Trib. to Neosho River?

It is owned by the County Highway Agency.