Rs 94 BB.8 - 200 over Neosho River
GoodMorris County, Kansas · 1.3S of Dunlap · Structure no. 000000000640B06
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 306 ft
- 3 main spans
- Daily traffic
- 115
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
Rs 94 BB.8 - 200 over Neosho River is a prestressed concrete continuous stringer/multi-beam or girder carrying Rs 94 BB.8 - 200 over Neosho River in Morris County, Kansas. It was built in 2023, so it is 2 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 115 vehicles a day, roughly 15% of them trucks, projected to reach 135 by 2043. The structure is 306 ft (93.2 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rs 94 BB.8 - 200 over Neosho River built?
It was built in 2023, making it 2 years old in 2025.
What condition is Rs 94 BB.8 - 200 over Neosho River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Rs 94 BB.8 - 200 over Neosho River carry?
About 115 vehicles per day (2011 count), of which roughly 15% are trucks.
How long is Rs 94 BB.8 - 200 over Neosho River?
The structure is 306 ft (93.2 m) long with a longest span of 116 ft (35.3 m) and a deck 26 ft wide.
Who owns Rs 94 BB.8 - 200 over Neosho River?
It is owned by the County Highway Agency.